What's New at Sweet Timber Frames ?
pine built-ins
Early January, 2010
pantry
Early January, 2010
pantry door
Early January, 2010
copper flashing
Early January, 2010
copper cap for solar flat panel flashings
Early January, 2010
Carl at work
Early January, 2010
solar flat panel roof mounting bracket flashing
Early January, 2010
installing 2X6 spruce sub-flooring
Early January, 2010
concrete base for raised fireplace
Early January, 2010
installing big French doors
Early January, 2010
carpenters at work
Franklin Maine area granite hearth stone
Late December, 2009
red cedar dormer trim
Late December, 2009
Maine white cedar entry timber framing
Late December, 2009
windows, trim, and Maine white cedar shingles
Late December, 2009
second floor 2X6 spruce sub-flooring
Late December, 2009
hand nailed wood floors
Late December, 2009
hearth stone installed at the fireplace
Late December, 2009
winter working conditions
Late December, 2009
barn complete
Sal and Blackie ready to play ball
December 1, 2009
how to build a house in a Maine winter
December 1, 2009
ten dustpan dormers
December 1, 2009
barn second floor stair landing
December 1, 2009
handrail
December 1, 2009
retaining walls and masonry stair well pump house for the hot tub
December 1, 2009
trench drain and barn behind
December 1, 2009
barn entry framing and light
December 1, 2009
Tarm wood gasification boiler and 806 gallon water tank for heat storage
December 1, 2009
second floor balusters, newel posts, and handrails
December 1, 2009
kitchen cabinets, gas stove, and pantry
December 1, 2009
reinforced poly blocks the cold northwest wind
December 1, 2009
Freshwater Stone, granite caps for the retaining walls
December 1, 2009
southwest corner
December 1, 2009
Jan on the roof
dormer sidewall cedar shingles
October 31, 2009
copper step flashings
October 31, 2009
south side of the barn
October 31, 2009
shower tile work and maple flooring
October 31, 2009
radiators and tub
October 31, 2009
east bedroom shower
October 31, 2009
barn stair well
October 31, 2009
barn living room
kitchen gas stove
October 24, 2009
second floor maple flooring
October 24, 2009
Glen finishing maple floors
October 24, 2009
hot tub piping
October 24, 2009
dustpan dormer build-out
hot tub
October 17, 2009
antique granite veneer stones cut in Franklin, Maine over 100 years ago
October 17, 2009
barn first floor bathroom and shower
October 17, 2009
pedestal sink
October 17, 2009
barn master bedroom
October 17, 2009
barn master bathroom
October 17, 2009
Priscilla
October 17, 2009
Jim and Jeff
Mark
Freshwater Stone granite slabs vertically positioned to conceal concrete retaining walls
September 24, 2009
antique granite veneer stones on the northwest corner of the house
September 24, 2009
full walkout basement
September 24, 2009
4.5 inches of Dow Styrofoam insulation on the house and barn roofs
September 24, 2009
pipe staging to the cupola
September 24, 2009
fan in the barn master bedroom
September 24, 2009
maple floor sanding in the barn
September 24, 2009
barn chimney bricks and thimble for wood stove connection
September 24, 2009
main entry door for the barn
September 24, 2009
cypress on mahogany door
barn main entry door
August 19, 2009 - Pre-Hurricane Bill
Frenchman's Bay looking south
August 19, 2009 - Pre-Hurricane Bill
ready for stormy weather
August 19, 2009 - Pre-Hurricane Bill
Craig tiling barn shower in the master bedroom
August 19, 2009 - Pre-Hurricane Bill
enclosed house
August 15, 2009
main house with the barn house behind it
August 15, 2009
pipe staging and planks for a safe work place
August 15, 2009
main house basement floor beam, post, and plate
August 15, 2009
main house second floor
August 15, 2009
barn house through main house dormer window
August 15, 2009
2X6 spruce tongue and groove vertical boarding
August 15, 2009
enclosed timbers
August 15, 2009
post and second floor tie beam for the main house
twenty dustpan dormers
August 8, 2009
basement post, floor joists, and girder beam
August 8, 2009
window well from the basement of the house
August 8, 2009
Freshwater Stone Pearl granite slabs conceal the retaining walls
August 8, 2009
cupola timber framing
August 8, 2009
dustpan dormer header
August 8, 2009
cupola corner post and Sullivan harbor
August 8, 2009
main house roof ridge and cupola
August 8, 2009
all eastern hemlock timbers from the Maine woods
August 8, 2009
main house enclosed
Timber Frame Specialists!
Sal and Blackie doze on the porch.
Timber Frame Construction is Underway
Lowering the dormer to the timber frame.
Timber Frame Crew and Specialists
The entire timber frame crew is pictured in the new timber frame home.
First Dormer added to Timber Frame
A crane lifts the first dormer onto the timber frame.
Timber Frame Home - Southeast Corner
This is the southeast corner of the timber frame home.
Timber Frame Construction
Pegging the bents during timber frame construction.
Timber Frame Heating and Insulation
Pex heat tube over rigid insulation
Timber Frame Construction
Comelong pulls the post onto the tie beam.
Timber Frame Construction Materials
This post, tie beam, and diagonal braces will be used in the timber frame construction.
Mortise and Tenon for Timber Frame
Pictured here is an example of a housed mortise and tenon that will be used in the timber frame.
Timber Frame Barn
An adjacent 36-foot by 60-foot timber frame barn has a completed exterior.
Timber Frame Timber Sill
A poly tent protects the timber sill of this timber frame home in Sorrento, Maine.
Sweet Timber Frames
Timber Frame Homes